Bathroom refurbishment – Existing floor tiles, white goods, and ply had to be removed for this project.

We stripped the ceiling and walls down to the brick. New plumbing, electrics, boarded walls, suspended ceiling, skimmed room, and ply floor installed.

In addition, we re-tiled, grouted, siliconed, and installed a waterproofing system. The ceiling was painted, the towel rail was replaced, and new appliances and fixtures were installed (roll holder, mirror)